Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Thursday, 20th of November 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.eriks.co.uk/bigplus/
What next?
 Request further Information     Visit Website     Send to friend
 Reznor (UK) Ltd company's profile
Click to visit sponsors web site

Click to visit sponsors web site



Click to visit sponsors web site

Click to visit sponsors web site





Click to visit http://air.irco.com/uk/

Machine Building 2009
MTec 2009



Click here for the latest compressed air news !

Steel bright after storage
September 1st 2005

Reznor V3 gas-fired warm air heaters have been installed in the Waterbeach depot of Parker Steel to operate round-the-clock and maintain the condition of bright engineered steels stored at the depot.

Bright steel is shiny and welloiled and must be kept free from damp, frost and corrosion at all times.

The Reznor V3 heaters were specified and installed by Hadene Mechanical Services of Chatham.

Six vertical downflow units were suspended from the roof at 10m from floor level. Operating 24h/day to maintain a constant 10°C internal air temperature throughout the building, they keep the stock slightly warm to ensure condensation cannot form on the steel, no matter what temperature prevails outside.

The heaters have four-way deflectors and a high/low burner to distribute warm air effectively. Roofmounted destratification fans help distribute the otherwise wasted warm air gathering in the roof space, further assisting the dehumidification process.

More articles from Reznor (UK) Ltd: