Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Thursday, 20th of November 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.eriks.co.uk/bigplus/
What next?
 Request further Information    visit web site     Send to friend
 The Spaceway Group company's profile
Click to visit sponsors web site

Click to visit sponsors web site





Click to visit sponsors web site

Click to visit http://air.irco.com/uk/



Click to visit sponsors web site

Machine Building 2009
MTec 2009



Click here for the latest compressed air news !

Versatile panel system designed for cleanrooms
November 1st 2005

Aflexible bi-panel partition system has been introduced by Spaceway South for industrial cleanrooms and medical environments.

Produced by Komfort, Precision CX combines ease of installation with a state-of-the-art anti-microbial coating that increases the level of defence against bacteria and other micro-organisms.

Demountable and relocatable, CX allows the replacement and reconfiguration of panels to take place quickly and easily without affecting adjacent panels.

Factory produced steel panels come with pre-bonded Sterivin vinyl and plasterboard, reducing installation time, allowing faster occupation of critical areas and helping to reduce cost.

The Precision CX system is designed to help maintain a clean environment by designing out dust ledges and sites for microbial and other contamination through the use of proprietary dry gaskets. A special head extrusion allows the fitting of formed or flat coving dependent on location and specification. An adjustable, recessed levelling base detail enables the vinyl flooring to be coved up the plinth, providing a flush interface between floor and wall and around glazed units.

Special pre-formed junctions can be used to further quicken on-site construction. Alternatively, cutpanel intersections negate the need for accurate surveys when used in conjunction with the coving detail.

The design of the central steel stud allows the void depth to be increased to 600mm. This enables the partition to carry and conceal services such as electric, gas, airhandling ducting and so on.

Made by Corus, the pre-finished steel can be treated with Corus Assure technology, a special coating with Microban antimicrobial protection.

More articles from The Spaceway Group: