Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Thursday, 20th of November 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.eriks.co.uk/bigplus/
Click to visit sponsors web site





Click to visit sponsors web site



Click to visit sponsors web site

Click to visit sponsors web site

Click to visit sponsors web site

Click to visit http://air.irco.com/uk/

Machine Building 2009
MTec 2009



Click here for the latest compressed air news !

New system bridges the gap
September 18th 2003

Loading partly processed batches of material into containers at Zotefoams has been simplified with two Poweramp dock levellers from Easilift Loading Systems

Zotefoams makes nitrogenexpanded Polyolefin foams

Polyolefin slabs saturated with nitrogen are frozen to -25°C in two 40ft long static freezer containers at the Croydon factory

There’s a 300mm height difference between the external concrete dock from where the blanks are loaded, and the floor of the freezer containers. This is bridged by the two Poweramp 233 hydraulic dock levellers, raised and lowered automatically by the press of a button and brought to the correct height, after which a 500mm long telescopic lip is extended until it meets the floor of the container.

More articles from Easilift Loading Systems Ltd: