Free health check July 1st 2010 Energy chain expert igus UK is
inviting maintenance engineers to
book a free energy chain and flexible
cable annual check-up before or
during factory shutdowns scheduled
for July or August.
"During shutdowns, time is of the
essence," explains Justin Leonard of
igus UK. "If our inspections do flag
up a problem, we can ensure that
replacement parts are delivered and
engineers are at hand during your
shutdown. In addition, as we stock
our E-Chains and cables at our facility
in Northampton, replacement parts
can normally be delivered and
installed during the same shutdown
period." More articles from igus (UK) Limited: |