Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Saturday, 22nd of November 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.igus.co.uk

What next?
 Request further Information    visit web site     Send to friend
 Hormann UK Ltd company's profile
Click to visit sponsors web site

Click to visit http://air.irco.com/uk/

Click to visit sponsors web site

Click to visit sponsors web site



Click to visit sponsors web site

Machine Building 2009
MTec 2009



Click here for the latest compressed air news !

Bays equipped
September 1st 2007

Hörmann UK has installed 19 standard loading bays, all with wheel guides for ProLogis' Distribution Centre 4 in Stafford.

The specification included a single double deck bay which has a 4500mm long platform with 1000mm long telescopic lip dock leveller.

The 4500mm high dock shelter has a secondary electric (roller blind) top flap which can be placed in the best position and allows a large vehicle range to be served and sealed with inch-perfect precision. The double deck bay can service vehicles 3650 to 5200mm high with bed heights of 785 to 1860mm.

Hörmann equipment was also used on the three other distribution centres at the Stafford site.

More articles from Hormann UK Ltd: