Surefooted March 1st 2006 Flowcrete's Flowfast Quartz flooring has provided a firm footing underfoot for a new RNLI lifeboat station. The new facility at Fleetwood features flooring from Hi-Spec Industrial Flooring who installed the Flowfast Quartz system in red in the lifeboat house.
The lifeboat is kept on a ramp and , as a result, a high grade of slip resistance was required for the area. Standard grade Flowfast with coving was also installed in the workshop area. Flowfast has a curing time of less than one hour. More articles from Flowcrete Systems Ltd: |