Floor gets an upgrade January 1st 2008 Concrete Grinding has upgraded
750 linear metres of flooring to DIN
15185 specification in a new
distribution warehouse built by
Farsons Brewery on the island of
Malta.
The project has enabled man-up
lift trucks to operate at maximum
speed and efficiency in the 12mhigh
racking installation in the
warehouse, which stores the
company's own products as well
as imported drink and food.
CG advised Farsons at the precontract
stage on the floor design
and racking layout in order to
minimise the amount of grinding
that would be required. After the
floor had been installed by a local
contractor, CG ground three wheel
tracks in 13 of the 50m aisles and
the full width of two other aisles in
order to achieve compliance with
the flatness specification.
Aisles were ground using the
Laser Grinder system in just 23
working days. CG also filled 120
joints within the aisles with a
special material to prevent damage