Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Wednesday, 03rd of December 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.igus.co.uk

Click to visit sponsors web site

Click to visit http://air.irco.com/uk/

Click to visit sponsors web site



Click to visit sponsors web site

Click to visit sponsors web site

Machine Building 2009
MTec 2009



Click here for the latest compressed air news !

Manrider belt conveyor makes operations easier
September 1st 2007

The increase in overseas goods arriving loose loaded in high cubed 12.0m sea containers is proving a problem for many import companies with regard to the manual unloading operation.

Newland Engineering's Newland MTC135 Manrider Multi-Telescopic Belt Conveyor is able to reach goods at the highest level inside the container. Positioned on the platform the operator can extend, raise and lower the telescopic booms into the container by means of the push button console on the front of the telescopic boom.

The platform depth, width and hand rail height can be manufactured to suit individual customer requirements. The Newland MTC135 Manrider has a telescopic extension of 13.5m and comes in either one man or two man carrying options, with a platform lift-up mechanism.

This allows the operator to retrieve goods from the floor of the container without standing on the platform and transfer them to the belt with greater ease.

More articles from Newland Engineering Co Ltd: