Register | Login | Set as Home Page | Bookmark | General Enquiries | Help | Saturday, 22nd of November 2008
IPE Logo
ipesearch.com
Search 
Magazine 
Register for our ENewsletter
Click to visit http://www.atlascopco.co.uk/ukus/news/companynews/energycd.asp

What next?
 Request further Information     Visit Website     Send to friend
 Reznor (UK) Ltd company's profile
Click to visit sponsors web site



Click to visit http://air.irco.com/uk/



Click to visit sponsors web site

Click to visit sponsors web site

Click to visit sponsors web site

Click to visit sponsors web site

Machine Building 2009
MTec 2009



Click here for the latest compressed air news !

Warmth and fresh air
September 1st 2007

At the Futuba Industrial factory in Derbyshire, 25 Reznor warm air heaters at different roof heights provide warmth and fresh air ventilation for a complex welding and assembly operation. The factory is in two open sections, each having different comfort and air quality requirements.

In the high level pressing and moulding area, 15 Europak PV2096-10 high efficiency units are installed internally at 8m from floor level.

They have two motors to ensure optimum distribution of tempered and fresh air. In the welding area where haze build-up could compromise air quality, 10 T2000E high efficiency heaters with an output of 36kw are mounted on internal walls. The lower roof height in this part of the factory required the heaters to be positioned at 5.5m from floor level. Units are room sealed.

More articles from Reznor (UK) Ltd: