Articles about this company:
Denca gives the right chemistry (1st November 2011)
Flexibility and responsiveness to customer needs are reported to be among the attributes which have enabled automation and control systems specialist, Denca Controls, to develop a close working relationship with a lea
From Plant process control
Contract for control (1st July 2011)
Automation control systems their final working location.
Peanut butter – all under control (1st May 2011)
Denca has completed the automation of the control system for Duerr's new peanut butter facility.
Turning the key to better control (1st March 2011)
Automation and control systems specialist Denca Controls, has been commissioned by a producer of patient care pharmaceuticals and biotechnology to supply the control systems expertise for its new manufacturing facili
Case of where there's muck there's energy (1st September 2010)
Endress+Hauser has appointed Denca Controls to install and commission the control system for a new sludge incinerator at United Utilities' sludge and sewage incineration site at Shell Green,Widnes.
Major control systems contract (1st July 2010)
Denca has secured a major control system contract with Endress+Hauser, for United Utilities'Mersey Valley Processing Centre, Shell Green.
Providing support for treatment works (1st January 2010)
Few people driving past United Utilities'Wybersley Water treatment Works in Cheshire will even hazard a guess as to the role this stateof- the-art process plays in producing safe drinking water for homes and businesses
PLC system proves recipe for success at Duerrs (1st May 2009)
Denca Controls has installed a PLC solution for Duerr's new jam cooking plant in Wythenshawe,Manchester, providing enhanced recipe management and control of all operations – from cooking through to jar filling.
Full body tracking (1st September 2008)
Denca Controls has operability.
Process control (1st July 2008)
Phoenix Chemicals is a pharmaceutical intermediates and fine chemicals manufacturer, specialising in the safe handling of hazardous reactions and chemical processing problems through continuous processing. Denca Contro
Quality logging (1st May 2008)
Denca Controls is implementing Quality Logging Systems at Jaguar Cars' Halewood and Castle Bromwich manufacturing sites. The systems will eliminate paper-based quality reporting at both plants.
From small to large projects (1st March 2008)
Denca Controls has been awarded a prestigious contract by Astech Projects. It was awarded after Denca demonstrated its ability to complete smaller projects on time and on budget.
Status monitor (1st January 2008)
Denca Controls has developed, installed and comissioned a SCADA solution that enables compressor status to be monitored in the control room of Premier Power's gas-fired electricity generating station B in Northern Irela
From Energy management
PLC upgrade (1st November 2007)
Denca Controls has completed a significant legacy PLC upgrade programme at the North-Westbased R&D centre of excellence for a global pharmaceutical business. Denca's remit embraced the staged replacement of the legacy PLC eq
Control role (1st September 2007)
Denca Controls has helped Primary Fluid Power of Knowsley with the upgrading of the hydraulic system capability at Bidston Moss waste disposal site on Merseyside.
Denca in control (1st July 2007)
Denca Controls has designed,developed and installed all necessary control system solutions as required to operate the WFI (Water for Injection) pharmaceutical grade water system at the brand new National Biomanufacturi
User-friendly control and automation solutions (1st May 2007)
Control technologies specialist, Denca Controls, has provided the control system and automation technologies behind a 7-axis flat table mounting and proofing machine developed by J.M.
From Production engineering